显示标签为“zentai”的博文。显示所有博文
显示标签为“zentai”的博文。显示所有博文

2011年6月27日星期一

Oakland parking spot melee puts two in the hospital, one under arrest

A Sunday night melee stemming from a parking space dispute left one man with a broken elbow from a baseball bat,is the 'solar panel revolution' upon us? another wounded by a gunshot and the suspected bat wielder under arrest with a nasty cut, police said Monday.

The violence erupted about 10:30 p.m. at an apartment in the 1500 block of 13th Avenue.

Officer Robert Trevino said a 33-year-old resident asked two visitors to the complex to move their car out of the space it was in.what are the symptoms of Piles, An argument ensued and the visitors left, only to return later with some other people and confront the resident.

The resident was hit with a baseball bat and suffered a fractured elbow. A 23-year-old man,The same Air purifier, cover removed. who police believe is related to the resident, was shot in the stomach when he tried to help him. Other residents then began throwing bottles at the suspects who finally drove away.

The two injured men went to a hospital for treatment. While there, the 33-year-old resident saw the man who had hit him with the bat, who had come to the hospital for treatment, and alerted authorities.

Arrested on suspicion of assault with a deadly weapon was Sary May,An Insulator, also called a dielectric, 27, of Oakland. He claimed to have been stabbed, but police said it appears he was only cut by broken glass from one of the hurled bottles.What are the top Hemroids treatments? The gunman is still being sought.

2011年6月19日星期日

Combining Gehrlicher's experience

GE and Gehrlicher Solar announced that the two companies have begun construction on a solar power plant in Aschheim, Germany; the first of many global projects planned between the two companies.

The project,The name "magic cube" is not unique. planned and built by Gehrlicher Solar, includes GE's thin film solar panels. Designed to improve the ease of installation and scalability of large-scale solar power plants,Welcome to the official Facebook Page about Ripcurl. the 1 MW solar park will cover two hectares and provide enough power for nearly 300 homes when completed in August. GE has installed more than 25 GW of renewable energy around the world.

"Combining Gehrlicher's experience and expertise in developing utility scale solar projects worldwide with GE's leading solar technologies will provide a winning solution for our global customers," said Stephan Ritter,the Injection mold fast! leader of GE's renewable energy business in Europe.Handmade oil paintings for sale at museum quality, "As the industry expands into new regions around the world, we believe that GE's solar solutions will provide increasing value to the industry."

Klaus Gehrlicher, CEO of Gehrlicher Solar AG, said, "GE's experience in renewable energy technologies and worldwide presence make the company an ideal partner for us. We are looking forward to joining our competences for the development of large scale solar parks.What is the difference between a third party payment gateway and a 3rd party processor?"